Skip to content
Two-level timber deck with steps, a lawn and a close-board fence

Swindon · SN1–SN5 · SN25 · SN26

Decking in Swindon

A deck fails when the frame sits in wet soil. We build composite and treated timber decks in Swindon on frames with airflow, proper joist spacing and steps that feel solid.

What is included

  • Frame set above the ground, not buried in it
  • Composite or treated softwood boards
  • Steps, edges and balustrade where the drop needs it
  • Old deck taken away
  • A written quote before we order boards

Options

  • Composite

    Higher spend up front, then a wash rather than a stain. A fair choice if you do not want weekend maintenance.

  • Treated timber

    Warmer look, lower starting price, and a coat of preservative every couple of years.

  • Split-level

    Useful on the slopes around Old Town, Wroughton and the villages north of Swindon.

  • Balustrade

    Metal or timber rails where a deck sits above a lawn or a drop.

How the job runs

  1. 01

    Check levels, doors and where the deck should drain.

  2. 02

    Set the frame and joists.

  3. 03

    Fix boards, steps and rails.

  4. 04

    Clear offcuts before we leave.

What changes the price

Straightforward jobs often start from £90 / m². Timber or composite, built on a solid frame. The written quote replaces this guide.

  • · Area and board choice
  • · How high the deck sits
  • · Steps and balustrade
  • · Replacing a rotten existing frame

Recent decking projects in Swindon

Before & After: Overgrown garden to a dark deck

The broken slabs, sleepers and weeds came out. A dark composite deck with steps now fills the same garden.

Dark composite deck with wide steps in the same gardenOvergrown back garden with broken slabs, gravel and old sleepersBeforeAfter

Before & After: Timber deck, lawn and new fence

The bare soil and old slabs were replaced with a two-level timber deck, a lawn and a close-board fence.

Two-level timber deck, lawn and close-board fence beside the same summerhouseUneven lawn and old slabs beside a blue summerhouseBeforeAfter

Before & After: New boards on a railed deck

The weathered boards on the raised deck were replaced, and the cable railing was left in place.

New timber boards on the same raised deck and cable railingWeathered deck boards with a stainless cable railingBeforeAfter
  • BeforeLawn with old slabs, bricks and materials before a deck was built
  • AfterRaised timber deck with a balustrade on a lawn

See every before and after

Questions

Does composite decking get slippery?

Grooved boards and a sensible fall help. Shade and leaves matter more than the brand. We will say if a patio is the better surface in a dark corner.

How long will it last?

Composite is often 20–25 years. Treated softwood is closer to 10–15 if it is kept off the soil and re-treated.

How much does decking cost in Swindon?

Decking starts from £90 a square metre, timber or composite, on a solid frame. The height, the steps and any rails change the price.

Is composite decking better than timber?

Composite costs more at the start and then needs a wash. Treated timber costs less and wants a coat of preservative every couple of years. We will say which one suits how you use the garden.

How long does a deck take to build?

A straightforward deck is often a few days. A high deck or a split-level deck takes longer.

Can you replace a rotten deck?

Yes. If the frame is soft we rebuild it. New boards on a rotten frame fail again.

Can you build a deck on a slope?

Yes. A split level suits the sloping gardens in Old Town, Wroughton and the villages.

Will the frame sit in the soil?

No. The frame is kept up so air can move under it. A deck buried in wet soil is the one that rots.

Do you fit steps and rails?

Yes, where the drop needs them. They are priced in the quote, not added after the boards are down.

Do you remove the old deck?

Yes. Taking it away is part of the quote.

Across Swindon

Decking is based in Swindon, covering SN1, SN2, SN3, SN4, SN5, SN25 and SN26. Open the area nearest the job.

Deck estimate

Length and width are enough. Board and joist sizes are under more options.

More options
  • Deck area12.00 m²
  • Composite boards42 nr
  • Joists11 nr
  • Each joist3.00 m
Notes
  • Boards run the way you chose. Joists run across the boards, spaced at the centre you entered.
  • Joist spacing is not a span table. Use the board maker's maximum span and change this figure.
  • Bearer posts are not counted. The height and the ground decide those on site.

Estimate only. Not a quote or a structural design.

Ready for a free, no-obligation quote?

Call 07767 464 143 or WhatsApp photos, a rough measurement and your postcode.